Pontonbrücke und neue Rheinbrücke bei Maxau (LFS03225)
Résumé
Contexte et analyse
The pontoon bridge near Karlsruhe Maxau has a long tradition and was only one of many such crossings, some of which were operated for a long time. From the middle of the 19th century there were seven pontoon bridges across the Upper Rhine: Kehl - Strasbourg (1815-1897), Maxau (1840-1938), Germersheim (1877-1945), Speyer (1866-1938, Mannheim - Ludwigshafen (1705 - 1867), Worms (1855-1900) and Mainz-Kastel 1861-1885). In order to increase traffic between Baden and Alsace, which is again under German administration, nine new ship bridges were built on pontoons between Weil am Rhein and Maxau from 1872 (Weil - Hünningen, Neuenburg - Eichwald, Breisach - Neubreisach, Sasbach - Marckolsheim, Kappel - Rheinau, Ottenheim - Gerstheim, Freistett - Gambsheim, Grefferin - Drusenheim, Pittersdorf - Selz). They were usually used until the end of World War II and beyond.
Maxau pontoon bridge
The first bridge at Maxau was inaugurated on August 25, 1840. When the railway line from Karlsruhe to the Palatinate was built in 1862, a new bridge was necessary, which also made it possible for the railway to cross the Rhine. In 1865, for example, a new ship bridge was built that could use both rail and private transport. When a ship on the Rhine wanted to cross the bridge, elements were opened in the middle to allow passage. Then they were folded in again and traffic could flow over the bridge. This bridge construction was awarded a gold medal at the Paris World's Fair in 1867 as a technical pioneering achievement. Until a new bridge near Germersheim was able to serve freight traffic, considerable amounts of coal were transported from the Saarland to the southwest via the Maxau pontoon bridge.
Technical details pontoon bridge Maxau
The bridge had a total length of 363 meters, of which it itself was 234 meters long and the driveways an additional 129 meters. It consisted of 34 pontoons, which were assembled into twelve elements. Six of them could be opened in the middle for the ships crossing. The track in the middle separated the two tracks for the rest of the traffic. The advantage of such a bridge, in addition to the lower construction costs compared to a fixed bridge, was that it could adapt very flexibly to different water levels. The relatively low load capacity of the pontoon bridge of around 100 tons made it necessary to use particularly light locomotives. The max. five wagons of a train were driven over the Rhine with this special locomotive and taken over by a more powerful locomotive at the other end. The operation of the bridge was discontinued in the event of ice in winter.
New construction of the Maxau Bridge
Lieux ou monuments
Article rédigé par
Kay Hoffmann, 21 novembre 2018